Download: RSS | Email Alerts | SMS Alerts | Podcasts | Wireless | Mobile Local News
Find It!
Follow us on twitter!
iPhone App Now Available!
NBC 15 Poll
Traffic: Mobile/Pensacola, FL
Last Update: 7/2/2009 9:55:02 PM

Severity: Construction

Problems: Long-term road construction
Location: US 43 Both NB/SB between CO HWY 96/COY SMITH HWY/MILITARY RD and MOBILE/WASHINGTON COUNTY LINE
Lanes Impacted:
ROAD AND BRIDGE WORK IN THE CALVERT AREA COULD CAUSE OCCASIONAL DELAYS IN THE AREA.
Reported on 7/2/2009 6:00:00 PM and Expected to end on 7/3/2009 6:00:00 PM

Problems: Long-term road construction
Location: HWY 113 Both NB/SB between US 29 and I 65
Lanes Impacted:
ROAD AND BRIDGE WORK CONSISTING OF ADDITIONAL LANES AND BRIDGES COULD CAUSE FOR LANE CLOSURES AND DELAYS.
Reported on 7/2/2009 6:00:00 PM and Expected to end on 7/3/2009 6:00:00 PM

Problems: Long-term road construction
Location: US 98 Both EB/WB between HWY 292/PACE BLVD/GARDEN ST and HWY 295/S NEW WARRINGTON RD
Lanes Impacted:
LONG TERM CONSTRUCTION: REPLACEMENT OF THE BAYOU CHICO BRIDGE. DOT WILL ALSO BE WORKING ON THE APPROACHES TO THE BRIDGE. THE WB BRIDGE WILL BE CONVERTED TO ACCEPT TWO WAY TRAFFIC. USE CAUTION THRU THE AREA AND WATCH FOR WORKERS ENTERING AND EXITING THE AREA.
Reported on 7/2/2009 6:00:00 PM and Expected to end on 7/3/2009 6:00:00 PM

Problems: Bridge maintenance operations
Location: I 110 None at I 110
Lanes Impacted:
CLEANING PAINTING WORK ON THE I-110 BRIDGE NEAR THE CIVIC CENTER. EXPECT INTERMITTEN LANE RESTRICTIONS, HOWEVER THERE WILL BE NO LANE CLOSURES BETWEEN 10:30 AM AND 7:30 PM. USE CAUTION AND WATCH FOR WORKERS ENTERING EXITING THE WORK ZONE.
Reported on 7/2/2009 6:00:00 PM and Expected to end on 7/3/2009 6:00:00 PM

Problems: Long-term road construction
Location: THREE NOTCH ROAD (CR 32) Both EB/WB between McDONALD ROAD (CR 39) and SCHILLINGER ROAD (CR 31)
Lanes Impacted:
UTILITY CREWS CURRENTLY WORKING IN THE AREA RELOCATING SERVICES. THIS IS PHASE ONE OF THE 6 MONTH PROJECT. BEING A MAJOR ARTERY DRIVERS MAY EXPERIENCE DELAYS DURING THE DRIVE TIME HOURS. ALTERNATES..TO THE NORTH USE COTTAGE HILL, TO THE SOUTH USE OLD PASCAGOULA.
Reported on 7/2/2009 6:00:00 PM and Expected to end on 7/3/2009 6:00:00 PM

Problems: Major road construction
Location: I 110 Both NB/SB between MAXWELL ST/EXIT 3 and I 10
Lanes Impacted:
WORK IS NEARING COMPLETION ON THE SIX LANING OF THIS SECTION OF I-110. MISCELLANEOUS CONSTRUCTION WORK CONTINUES, BUT NO LANE CLOSURES ARE CURRENTLY PLANNED IN ASSOCIATION WITH THIS PROJECT.
Reported on 7/2/2009 6:00:00 PM and Expected to end on 7/3/2009 6:00:00 PM

Problems: Long-term road construction
Location: N ALCANIZ ST SB SB between E CERVANTES ST and E WRIGHT ST
Lanes Impacted:
EXPECT LANE SHIFTS DURING DAYTIME AND INTERMITTEN LANE CLOSURES AT NIGHT. USE EXTRA CAUTION AND WATCH FOR WORKERS AND EQUIPMENT ENTERING AND EXITING THE WORK ZONE.
Reported on 7/2/2009 6:00:00 PM and Expected to end on 7/3/2009 6:00:00 PM

Problems: Construction work
Location: GARDEN ST EB near N PACE BLVD/NAVY BLVD
Lanes Impacted:
AUTHORITIES REPORT THE OUTSIDE TRAVEL LANE WILL BE SHUT DOWN BETWEEN PACE BLVD AND A STREET AS CREWS BEGIN MILLING AND PAVING OPERATIONS. DRIVERS CAN EXPECT ROAD CLOSURES BETWEEN 7.:30 PM AND 6 AM.
Reported on 7/2/2009 6:00:00 PM and Expected to end on 7/3/2009 6:00:00 PM

Problems: Construction work
Location: I 10 Both EB/WB between GEORGE C WALLACE TUNL and US 90/US 98/EXIT 35
Lanes Impacted:
SEVERAL DIFFERENT PROJECTS UNDERWAY ALONG THE BAYWAY. LANE CLOSURES ARE SCHEDULED FOR THE OVERNITE HOURS BUT DRIVERS MAY EXPERIENCE MINOR DELAYS FROM ONGOING DAYTIME CONSTRUCTION. WATCH FOR WORKERS AND EQUIPMENT ENTERING AND EXITING THE AREA.
Reported on 7/2/2009 6:00:00 PM and Expected to end on 7/3/2009 6:00:00 PM

Problems: Major road construction
Location: SORRENTO ROAD (SR 292) Both EB/WB west of BAUER ROAD (CR 293) and BLUE ANGEL PARKWAY (SR 173)
Lanes Impacted:
EXPECT DAYTIME LANE CLOSURES TO CAUSE DELAYS ON HWY 292 (SORRENTO ROAD-GULF BEACH HWY) BETWEEN INNERARITY POINT ROAD AND NAVY BLVD.
Reported on 7/2/2009 6:00:00 PM and Expected to end on 7/3/2009 6:00:00 PM




State News
Federal probe finds problems with chelation study
A federal investigation has found that heart attack survivors enrolled in a study of a controversial alternative medicine treatment were not told enough about potential dangers from the drug being tested, including death.
  This site is hosted and managed by Inergize Digital.
WPMI files and maintains quarterly Children's Television Reports in its Public File.
The Public File is available for viewing by the public at 661 Azalea Road, Mobile AL 36609, weekdays from 8:00am to 5:30pm.